Skip to Main Content

Ekstrom Library Third Floor Renovation Project: Collections

Due to our recent renovation project on Ekstrom’s third floor, materials listed as available on that floor may not physically reside there. An item may be available in our Robotic Retrieval System, high-density storage, or through Inter-Library Loan from another institution. We apologize for this temporary difficulty, and are working to correct our records.

During the renovation process some collections have moved, including:

Moved Collections
Collection / Service Old Location New Location Move Date
Student Government Association Video Collection 3rd floor 4th floor North September 2018
3rd floor book stacks (A - L call numbers, pre-2000) 3rd floor Temporary storage February - April 2019
Top Bottom